November 2020

posted in: Uncategorized | 0

Vacancy Part Time Assistant Clerk Vacancy Closing Date: Monday 7th December 2020
Job Description Assistant-Clerk-Job-Description Application Form Application-Form

Roadworks at Nazeing crossroads, details at ECC nazeing-road-traffic-signal-renewal
Letter to residents Resident-letter-Nazeing-Road-traffic-signal-renewal

Poppy Appeal Donate-to-the-Poppy-Appeal-2020

EFDC Civic Awards: Civic-awards-poster-2021

EFDC Civic Awards: Young Citizen of the Year: Young-Citizen
Press Release: Press-Release-Young-Citizen-of-the-Year-2021

October 2020

posted in: Uncategorized | 0

ECC Covid-19 Latest News Social-Media-Announcement-Covid-19-Latest-News-Tier-2-in-Essex
Local Covid-19 Alert Levels Local-COVID-alert-levels_-what-you-need-to-know-GOV.UK

Update Oct 2020 Situation-at-the-Leisure-Centre-and-Playing-Fields-Oct-2020
Reports NPC-Bumble-Green-Leisure-Centre-drainage-works-and-testing-report and EFDC-Recommendations-re-drainage-issue-at-the-Leisure-Centre

Footpath 1 Nazeing-FP1-Public-Notice-CO Nazeing-FP1-Map-showing-diversion

September 2020

posted in: Uncategorized | 0

Situation at the Leisure Centre and Playing Fields

Nazeing Parish Council are the owners of Bumbles Green Leisure Centre and the playing field. Thames Water were contacted to investigate and resolve the recent problem but were unable to. Following a further inspection of the Leisure Centre, the situation has deteriorated, there is now a nasty smell inside the building, there are puddles of sludge in the car park, which has spread onto the playing field and the land between the Leisure Centre and the Avenue has been contaminated.

The trees in the car park may have caused the below ground foul drainage system to collapse preventing the run off of waste water and sewage as well as rain water. This has led to a build-up of sewage in the manholes at the side of the Leisure Centre during its former occupation. It appears at first glance the rainwater pipework and foul drainage sewer pipework are connected below ground somewhere (this practice is no longer permitted for this very reason). The recent very heavy rain has forced a large quantity of sewage out of the manholes which has run under the shed and over the car park onto the playing field, the drier weather has seen the water content soak away leaving dried sewage on the ground.

The Council have informed the relevant authorities of the issue.  The Council have instructed contractors to quote for the decontamination and disinfection of the areas affected by the overflowing manhole, to quote to cap off the drainage to prevent this happening again and to take advice with regards to the removal of the trees and the demolition and clearance of the Leisure Centre.

The Council’s major concern and responsibility is to ensure the protection of the children and public that access this space. The Council will advise when the site is ready to be reopened and request any members of the public to refrain from trespassing on the site until the issue has been resolved. Notices have been erected around the site to advise the public. The Council have a Health and Safety duty of care which it takes very seriously and as such until the problem is resolved, the car park and pitches must remain closed.

Update 11/09/2020

August 2020

posted in: Uncategorized | 0

Nazeing’s Bumbles Green Playground remains closed. Significant work is required on this site before it can be re-opened.

Pound Close was open from 20th July 2020 and Elizabeth Close is open from 8th August 2020 but guidance must be followed. Checks will be conducted and if users of the play area are not observing the guidance, the Council will have no choice but to close the play areas again.
The following applies once the play area is open:
NOTICE-RE-OPENING-PLAY-AREAS and GUIDANCE IN DETAIL

July 2020

posted in: Uncategorized | 0

Nazeing’s Elizabeth Close and Bumbles Green Playgrounds remain closed. Work is required on both sites before they can re-open. Once open, users will need to follow Government guidance.

Pound Close is open from 20th July 2020 but guidance must be followed. Checks will be conducted and if users of the play area are not observing the guidance, the Council will have no choice but to close the play area again.
The following applies once the play area is open:
NOTICE-RE-OPENING-PLAY-AREAS and GUIDANCE IN DETAIL

March 2020

posted in: Uncategorized | 0

Information from the Council due to COVID-19 PARISH-COUNCIL-MEETINGS-AND-CONTACTING-COUNCIL

Epping Forest Community Transport C392 Bus-Routes-cancelled-Call-EFCT-for-essential-trips

HM Government Advice HM-Government-Advice-COVID-19

Please note that all Parish Council Play Areas are closed

Nazeing Parish Council Precept 2020/21 – Statement from the Council Nazeing-PC-Precept-for-2020-21

Nazeingberries Information Nazeingberries-lunch-poster-March-and-Events-in-March

CAB Quiz Night CAB-Quiz-Night-27-03-2020-Theydon-Bois