June 2021

posted in: Uncategorized | 0

Nazeing Parish Council’s Planning Application EPF/1154/21 for the Leisure Centre at Bumbles Green is available on the Epping Forest DC website.
Link to EFDC http://plan1.eppingforestdc.gov.uk/Northgate/PlanningExplorer/GeneralSearch.aspx

Nazeingberries Lunch in 3rd August (June lunch cancelled) Nazeingberries Lunch 3 August 2021

JUNE 2021
Langfield Close Road Closure 16 June 2021. Please click on the following link https://one.network/?tm=121955210 to find details of the intended closure of Langfield Close, due to commence on 16th June 2021 for 7 days. The closure is required for the safety of the public and workforce while Essex County Council undertakes Machine Surfacing.
Palmers Grove Road Closure 16 June 2021. Please click on the following link https://one.network/?tm=121955343 to find details of the intended closure of Palmers Grove, due to commence on 16th June 2021 for 7 days. The closure is required for the safety of the public and workforce while Essex County Council undertakes Machine Surfacing. 
Maplecroft Lane, Banes Down Road Closure 23 June 2021 Please click on the following link https://one.network/?tm=121955629 to find details of the intended closure of Maplecroft Lane, Banes Down, due to commence on 23th June 2021 for 7 days. The closure is required for the safety of the public and workforce while Essex County Council undertakes Machine Surfacing.
Nazeing Common Road Closure 23 June 2021. Please click on the following link https://one.network/?tm=122091742 to find details of the intended closure of Nazeing Common, due to commence on 23rd June 2021 for 2 nights 19:30-05:00. The closure is required for the safety of the public and workforce while Essex County Council undertakes machine surfacing.

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Keysers Road, Great Meadow, Nazeing Please click on the following link https://one.network/?tm=122573807 to find details of the intended closure of Keysers Road, Great Meadow, due to commence on 25th June 2021 for 6 days. The closure is required for the safety of the public and workforce while Essex County Council undertakes Micro Surfacing

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Western Road, Shooters Drive, Palmers Grove, Nazeing CP Please click on the following link https://one.network/?tm=122574304 to find details of the intended closure of Western Road, Shooters Drive, Palmers Grove, due to commence on 17th June 2021 for 7 days. The closure is required for the safety of the public and workforce while Essex County Council undertakes Machine Surfacing

FUTURE ROAD CLOSURES – AUGUST 2021
Highbridge Street Abbeyview Roundabout Closure 10 August 2021.Please click on the following link https://one.network/?tm=121360594 to find details of the intended closure of Highbridge Street, Abbeyview Roundabout, due to commence on 10th August 2021 for 2 nights 19:30-05:00. The closure is required for the safety of the public and workforce while Essex County Council undertakes machine surfacing.

FUTURE ROAD CLOSURES – SEPTEMBER 2021
Nazeing Common Road Closure 02 September 2021. Please click on the following link https://one.network/?tm=122091742 to find details of the intended closure of Nazeing Common, due to commence on 2nd September 2021 for 2 nights 19:30-05:00. The closure is required for the safety of the public and workforce while Essex County Council undertakes machine surfacing.

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Nazeing Common, Nazeing

Please click on the following link https://one.network/?tm=122091742 to find details of the intended closure of Nazeing Common, due to commence on 29th June 2021 for 2 nights 19:30-05:00. The closure is required for the safety of the public and workforce while Essex County Council undertakes machine surfacing.

May 2021

posted in: Uncategorized | 0

Nazeingberries Lunches resume Nazeingberries-Lunch-22-June-2021

Situation at the Leisure Centre Update-May-2021

County Councillor Election Results Declaration of Result of Poll

Epping Forest Community Transport PART-TIME-MINIBUS-DRIVER

Betts Lane Road Closure 16 May 2021. Please click on the following link https://one.network/?tm=121426710 to find details of the intended closure of Betts Lane, due to commence on 16th May 2021 for 9 hours. The closure is required for the safety of the public and workforce while Openreach undertakes pole installation.

April 2021

posted in: Uncategorized | 0
His Royal Highness The Prince Philip, Duke of Edinburgh
HRH Prince Philip, Duke of Edinburgh
1921-2021

ANNOUNCEMENT 09 April 2021
It is with deep sorrow that Her Majesty The Queen announces the death of her beloved husband, His Royal Highness The Prince Philip, Duke of Edinburgh. His Royal Highness passed away peacefully this morning at Windsor Castle.

TRIBUTE FROM NAZEING PARISH COUNCIL Tribute-to-HRH-Prince-Phillip

Notice of Parish Council Vacancies Cllr-Vacancies-April-2021

Nazeing Litter Pickers Schedule April-to-October-2021

Foodbank information Epping-Forest-Foodbank-information

Spring Wildlife Walk Karen Murray and Damien Weller from the Countrycare Team at Epping Forest District Council put together this  self-guided circular walk of  about 3miles (4.83km) long for the Festival of Culture. The route takes you around Waltham Abbey gardens, Dragonfly Sanctuary and Cornmill meadows goes through various habitats consisting of flooded grassland, ponds, rivers and some of the site is designated as a site of Special Scientific interest.
Link waltham-abbey-gardens-dragonfly-sanctuary-and-cornmill-meadows-walk

News from EF Community Transport EFCT-New-services-return-April-2021

Events in the District April-May-2021-updates-from-the-Community-Culture-Wellbeing-Team-at-EFDC

Nazeing Litter Pickers Saturday 3rd April Details for 03-04-21 and contact information for Litter Pickers Group

Guided Walk Easter Monday 5th April Guided-Walk-Easter-Monday-5th-April

Back Lane Road Closure 05 April 2021 Please click on the following link https://one.network/?tm=120167136 to find details of the intended closure of Back Lane, due to commence on 5 April 2021 for 1 day. The closure is required for the safety of the public and workforce while BT undertakes pole replacement.

Back Lane Road Closure 05 May 2021 Please click on the following link https://one.network/?tm=120167136 to find details of the intended closure of Back Lane, due to commence on 5th May 2021 for 15 hours. The closure is required for the safety of the public and workforce while BT undertakes pole replacement.

March 2021

posted in: Uncategorized | 0

The Census is on 21 March 2021 Short Newsletter and How-to-get-help-Leaflet

February 2021

posted in: Uncategorized | 0

Update Road Closures Essex-Road-Hoddesdon-New-River-Bridge-improvement-scheme

Victim Support Volunteers Victim-Support-Volunteer-poster

Hoe Lane, Nazeing – closure 8 March 2021 for 3 days
Please click on the following link https://one.network/?tm=119803359 to find details of the intended closure of Hoe Lane, due to commence on 8th March 2021 for 3 days. The closure is required for the safety of the public and workforce while Affinity Water undertakes Fit Stop Tap / Boundary Box.

Back Lane, Nazeing – closure 10 March
Please click on the following link https://one.network/?tm=120167136 to find details of the intended closure of Back Lane, due to commence on 10th March 2021 for 15 hours. The closure is required for the safety of the public and workforce while BT undertakes pole replacement.

Hoe Lane, Nazeing – closure 23 – 26 Feb 2021
Temporary Traffic Regulation Order of Hoe Lane, Nazeing

Please click on the following link https://one.network/?tm=120158727 to find details of the intended closure of Hoe Lane, due to commence on 23rd February 2021 for 4 days. The closure is required for the safety of the public and workforce while Affinity Water undertakes new water connection.

Reminder Road closures Essex-Road-Hoddesdon-New-River-Bridge-improvement-scheme

November 2020

posted in: Uncategorized | 0

Vacancy Part Time Assistant Clerk Vacancy Closing Date: Monday 7th December 2020
Job Description Assistant-Clerk-Job-Description Application Form Application-Form

Competition Christmas-House-Lights-and-Decorations-Competition

Roadworks at Nazeing crossroads, details at ECC nazeing-road-traffic-signal-renewal
Letter to residents Resident-letter-Nazeing-Road-traffic-signal-renewal

Poppy Appeal Donate-to-the-Poppy-Appeal-2020

EFDC Civic Awards: Civic-awards-poster-2021

EFDC Civic Awards: Young Citizen of the Year: Young-Citizen
Press Release: Press-Release-Young-Citizen-of-the-Year-2021

October 2020

posted in: Uncategorized | 0

ECC Covid-19 Latest News Social-Media-Announcement-Covid-19-Latest-News-Tier-2-in-Essex
Local Covid-19 Alert Levels Local-COVID-alert-levels_-what-you-need-to-know-GOV.UK

Update Oct 2020 Situation-at-the-Leisure-Centre-and-Playing-Fields-Oct-2020
Reports NPC-Bumble-Green-Leisure-Centre-drainage-works-and-testing-report and EFDC-Recommendations-re-drainage-issue-at-the-Leisure-Centre

Footpath 1 Nazeing-FP1-Public-Notice-CO Nazeing-FP1-Map-showing-diversion

September 2020

posted in: Uncategorized | 0

Situation at the Leisure Centre and Playing Fields

Nazeing Parish Council are the owners of Bumbles Green Leisure Centre and the playing field. Thames Water were contacted to investigate and resolve the recent problem but were unable to. Following a further inspection of the Leisure Centre, the situation has deteriorated, there is now a nasty smell inside the building, there are puddles of sludge in the car park, which has spread onto the playing field and the land between the Leisure Centre and the Avenue has been contaminated.

The trees in the car park may have caused the below ground foul drainage system to collapse preventing the run off of waste water and sewage as well as rain water. This has led to a build-up of sewage in the manholes at the side of the Leisure Centre during its former occupation. It appears at first glance the rainwater pipework and foul drainage sewer pipework are connected below ground somewhere (this practice is no longer permitted for this very reason). The recent very heavy rain has forced a large quantity of sewage out of the manholes which has run under the shed and over the car park onto the playing field, the drier weather has seen the water content soak away leaving dried sewage on the ground.

The Council have informed the relevant authorities of the issue.  The Council have instructed contractors to quote for the decontamination and disinfection of the areas affected by the overflowing manhole, to quote to cap off the drainage to prevent this happening again and to take advice with regards to the removal of the trees and the demolition and clearance of the Leisure Centre.

The Council’s major concern and responsibility is to ensure the protection of the children and public that access this space. The Council will advise when the site is ready to be reopened and request any members of the public to refrain from trespassing on the site until the issue has been resolved. Notices have been erected around the site to advise the public. The Council have a Health and Safety duty of care which it takes very seriously and as such until the problem is resolved, the car park and pitches must remain closed.

Update 11/09/2020